Reference Specifications
for Energy and Resource Efficiency

California Energy Commission, Public Interest Energy Research (PIER)

Please Note:

The authors have tried to make the information in this document as accurate and useful as possible. However, they make no warranty, express or implied, and assume no legal liability for the information in this report. References to specific manufacturers or products are provided for the convenience of the reader and shall not be considered endorsements.

These specifications were prepared as a result of work sponsored by the California Energy Commission. It does not necessarily represent the views of the Energy Commission, its employees, or the State of California. The Energy Commission, the State of California, its employees, contractors, and subcontractors make no warranty, express or implied, and assume no legal liability for the information in this report; nor does any party represent that the use of this information will not infringe upon privately owned rights.

Please send comments or questions to specs@eley.com.

December 3, 2003
Section 01810 Update
Division15 Update
Division 17 Addition

Section 01810 Commissioning has been replaced to be consistent with the update to Division 15 and to incorporate more recent commissioning experience. Division 15 gets a new Section 15970 Mechanical Commissioning. Sample forms are also added for HVAC pre-functional and functional tests. In addition, control system specifications have been expanded and moved to a separate Division 17.

Divisions 7, 8, 16 Update, 12/31/02

These sections are modified to be consistent with the updated Section 01350. In addition, the contents of Divisions 7 and 8 have been edited to remove some less relevant requirements, and Division 16 has been improved and supplemented by a section of notes.

Section 01350 Update, 12/31/02

Minor edits have been made to incorporate comments in subsections:

Table 1
1.1.A.1.e
1.3.B.2.d
1.4.D.10
Notes: additional references.

Section 01350 is included in div1-6f.pdf and div1-6f.doc listed below.

Divisions 9-12 Update, 2/24/02

These sections are modified to be consistent with the updated Section 01350.

To Download:

To view the file in your browser, click on the file name. To download the file to your hard drive, "right-click" on the file name and choose "save target as".

Adobe Acrobat Format

Contents

File Name

Size

Date

Status

Divisions 1 - 6

div1-6g.pdf

1M

12/03/03

Updated

Division 7

div7e.pdf

208k

12/31/02

Complete

Division 8

div8d.pdf

152k

12/31/02

Complete

Divisions 9 - 12

div9-12c.pdf

274k

2/24/02

Complete

Division 15

div15d.pdf

770k

12/03/03

Updated

Division 16

div16c.pdf

46k

12/31/02

Complete

Division 17

div17a.pdf

600k

12/03/03

Complete

Sample HVAC pre-functional test forms (zip)

div15-pre-func-forms-pdf.zip

50k

12/03/03

Complete

Sample HVAC functional test forms

div15-sample-HVAC-functional-tests.pdf

903k

12/03/03

Complete

Microsoft Word Format

Contents

File Name

Size

Date

Status

Divisions 1 - 6

div1-6g.doc

600k

12/03/03

Updated

Division 7

div7e.doc

426k

12/31/02

Complete

Division 8

div8d.doc

403k

12/31/02

Complete

Divisions 9 - 12

div9-12c.doc

265k

2/24/02

Complete

Division 15

div15d.doc

370k

12/03/03

Updated

Division 16

div16c.doc

220k

12/31/02

Complete

Division 17

div17a.doc

310k

12/03/03

Complete

Sample HVAC pre-functional test forms (zip)

div15-pre-func-forms-doc.zip

80k

12/03/03

Complete

Sample HVAC functional test forms

div15-sample-HVAC-functional-tests.doc

360k

12/03/03

Complete

Return to Reference Specifications Homepage